This report assesses the underlying inputs to the NTR, how the NTR is being used by EDBs, and the progress towards implementing the NTR actions by EDBs.
This study evaluates the likely outcomes from two possible futures. Firstly, continuation with the low-fixed charge (LFC) regime. And secondly, removal of the LFC regime.
The purpose of this business case is to make the general case for investment in monitoring the low-voltage network.
A guide on when to use low voltage (LV) monitoring in the context of a changing electricity network with increased Distributed Energy Resources (DER).
This is a Q&A about why the Low Fixed Charge Regulations were unfair and why they are being phased out.
A guide to planning for electricity distribution networks under the Resource Management Act 1991.
A Guide to assessing and prioritising vegetation management outside of the requirements specified in the Electricity (Hazards from Trees) Regulations 2003.